Wednesday, December 1, 2010

December 1 - Floors in and trim

The floors are all in and most of the trim is up. We are waiting on a couple of doors that we weren't able to salvage or find at auction. Things are still moving along very quickly and are right on time.
 The view to the bonus/breakfast/Abby play room. The floors are all in and the trim is going up very quickly.

The butler pantry. There aren't doors, just these open door ways.

The new door to the basement. the space to the right of this shot is where the desk in the itchen will be.

A view upstairs in the landing area. This view is down the upstairs hallway through the master bedroom to the sliding doors leading to the second level of the deck (yet to be built).
 The hall bathroom and the door to the former master (future Abby's) room on the right.

The master bedroom. Here you can see how the tray ceiling came out. We really like it.
 Another view of the master bedroom. The slider to the upstairs deck to the left.

Back downstairs - a view through the kitchen to the living room and butler pantry (to the right).